Solid Rick Bible Camp - Soldotna, AK (Work Day 3)

Grant is working with two other men on the electrical wiring, insulation, and sheetrock for a new building. Two other men are working on trim molding for doors and windows in other buildings. Grant's team finished the electrical wiring today and started the insulation. In Alaska, they don't use insulation with a vapor barrier. Instead they use insulation without a vapor barrier and apply visqueen after. There are some other things that are different from building codes that Grant is used to. I continue on the envelopes for a mailing at about 150 envelopes a day. There are 1500 envelopes. It is slow and tedious.


I am behind in my blogging again, but hope to catch up today.